Plug-in solar in Maryland

Law in effect Checked November 10, 2026

Maryland's law took effect July 1, 2026. You may install one plug-in system of up to 1,200 watts per electric meter at a home. Unlike most states, you must notify your utility before you install and give it a safety certification for the device.

Effective date: July 1, 2026

The law

BillStageLast actionDates
HB 1532
Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act
Chapter 353, 2026 Laws of Maryland
Signed into law Approved by the Governor - Chapter 353 (May 12, 2026) Signed: May 12, 2026
Effective: July 1, 2026

The rules

Plug-in solar rules in Maryland
RuleWhat the law saysSource
Maximum size (output) 1,200 W
A portable solar energy generating system supplies a maximum power output of not more than 1,200 watts back to the building (PUA 7-321(a)(3)). One system per electric meter, residential use only (7-321(b)).
Source
Panel (DC) limit No limit set
The law caps output only.
Source
Plug-in batteries Not mentioned in the law
The section does not mention batteries.
Source
Tell your utility? Yes, before installing
You must notify your electric company before installation and give it a certification of the system's safety features and maximum capacity. If the system requires an automatic locking disconnect switch, you pay for its installation (7-321(e)).
Source
Utility approval needed? No
An electric company may not require approval before installing or using the system (7-321(d)(1)(i)).
Source
Renters and landlords Not mentioned in the law
The section does not mention landlords or tenants.
Source
HOAs and condo associations Not mentioned in the law
The section does not mention HOAs or covenants.
Source
Safety certification required Certified by UL or an equivalent lab
Must be certified by Underwriters Laboratory or an equivalent NRTL (7-321(a)(4)). A system with output to the outlet of 391 watts or less is exempt from listing provisions that would require alterations to the premises, wiring or panels (7-321(f)).
Source
Net metering Excluded
Not subject to the net metering sections 7-306 and 7-306.1; not eligible for the RPS and cannot generate renewable energy credits (7-321(c)).
Source

What's next

Watch for the utility notification forms and whether utilities ask for disconnect switches, which the customer pays for under the law.

Kits in Maryland

1product is likely compatible in Maryland; confirm with the seller.Maryland's law asks for certification by UL or an equivalent lab without naming a standard. We have seen a lab certificate for its inverter, but not for a complete kit. Certification watch.
Kits checked against Maryland's rules
KitAC outputUL 3700Fit in Maryland
APsystems EZ1-LV plug-in microinverter 900 W Certified (certificate seen), component only Likely compatible: confirm with seller certificate
EcoFlow STREAM Microinverter 1,200 W Unknown Listing claimed, no certificate seen maker’s claim
EcoFlow STREAM Microinverter + 2 x 400W Rigid Solar Panels 1,200 W Unknown Listing claimed, no certificate seen maker’s claim
Hoymiles HiFlow Pro LV HMS-391-1WM-LV 391 W Claimed by maker, not verified Listing claimed, no certificate seen maker’s claim
Hoymiles HiFlow Pro LV HMS-420-1WM-LV 420 W Claimed by maker, not verified Listing claimed, no certificate seen maker’s claim
Bright Saver Balcony Solar Kit, 180 W Not stated Not certified Listing claimed, no certificate seen maker’s claim Output not stated, but its panels total 180 W, so it cannot exceed the limit.
Bright Saver Balcony Solar Kit, 360 W Not stated Not certified Listing claimed, no certificate seen maker’s claim Output not stated, but its panels total 360 W, so it cannot exceed the limit.Check device count: Maryland allows one system per electric meter; this product has an unstated number of inverters.
CraftStrom 800 Watt Plug&Play Solar 700 W (estimated) Unknown Listing claimed, no certificate seen maker’s claim Check device count: Maryland allows one system per electric meter; this product has 2 inverters.
CraftStrom 1200 Watt Plug&Play Solar 1,050 W (estimated) Unknown Listing claimed, no certificate seen maker’s claim Check device count: Maryland allows one system per electric meter; this product has 3 inverters.
EcoFlow STREAM Ultra 800 W Unknown No certification evidence found
What these labels mean
Likely compatible: confirm with seller
Within the size limit, and we have seen a lab certificate for the kit’s inverter. The law asks for lab certification without naming a standard, so confirm with the seller that the whole kit qualifies.
Listing claimed, no certificate seen
The maker says the product is lab-listed (for example to UL 1741), but we have not seen a certificate.
No certification evidence found
We found no certificate and no claim for the certification this state requires.

How we judge kits.

Get alerts when a certified kit qualifies

What could it save?

For an 800 W panel kit at Maryland's average residential price of 21.18¢/kWh (September 2025 – August 2026 (12 months)):

Ideal tilt (20°, south)
1,117 kWh a year: about $163 typical (69% used at home), up to $237 best case (100%)
Vertical railing (90°, south)
730 kWh a year: about $107 typical (69% used at home), up to $155 best case (100%)

"Typical" uses HTW Berlin's model for an 800 W system without a battery; exports are assumed to earn nothing. Solar data: NREL PVWatts for Annapolis (capital). Try your own numbers · Is it worth it? · Railing vs tilted

Price source: EIA residential average, September 2025 – August 2026 (12 months).

Questions

Is plug-in solar legal in Maryland?

Yes. Maryland's law took effect July 1, 2026. You may install one plug-in system of up to 1,200 watts per electric meter at a home. Unlike most states, you must notify your utility before you install and give it a safety certification for the device.

How big can a plug-in solar system be in Maryland?

A portable solar energy generating system supplies a maximum power output of not more than 1,200 watts back to the building (PUA 7-321(a)(3)). One system per electric meter, residential use only (7-321(b)).

Do I have to tell my utility in Maryland?

Yes, before installing. You must notify your electric company before installation and give it a certification of the system's safety features and maximum capacity. If the system requires an automatic locking disconnect switch, you pay for its installation (7-321(e)).

Can my landlord stop me from using plug-in solar in Maryland?

The Maryland law does not mention landlords, so your lease still governs. The section does not mention landlords or tenants.

What certification does a kit need in Maryland?

Must be certified by Underwriters Laboratory or an equivalent NRTL (7-321(a)(4)). A system with output to the outlet of 391 watts or less is exempt from listing provisions that would require alterations to the premises, wiring or panels (7-321(f)).

Which kits are confirmed to qualify in Maryland?

None yet. We have not seen a certificate covering a complete kit, so no kit is marked compatible in Maryland.

Neighbouring states

Related: is it worth it? · railing vs tilted panels · renters guide · all kits · Certification watch · how we verify

Sources

  1. Maryland General Assembly: HB1532 (2026RS) legislation page (Legislature bill page; accessed November 10, 2026)
  2. Chapter 353 of 2026 (HB 1532), Utility RELIEF Act, chapter text (Law text; accessed November 10, 2026) Public Utilities Article 7-321 is in Section 1, which takes effect July 1, 2026.

This page is general information, not legal or electrical advice. Laws change and utilities differ. Check the linked official sources, your lease or HOA rules, and your utility before you buy or install anything. Full disclaimer.